Description
The chamber stack is turned upside-down to ensure that the shaft seal is not affected by the high pump discharge pressure
The Grundfos cartridge shaft seal ensures high reliability
two analog inputs
They are installed in the discharge line near the pump
5 kW MS402 motor with sand shield
installation kit i011 pp e c 4 6mm 2l 95730465 The chamber stack is turnedInstallation kit for easy installation of the dosing pump. The kit includes: Non return footvalve with strainer, weight, low level and empty switch Injection unit 6 m. discharge tubing 2 m. suction tubing 2 m. vent tubing
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























