Description
Pump start/stop
Status LEDs for pulse and manual
Grundfos Connect)
The CMBE booster is very easy to install
Pipework connection is via PN 16 DIN flanges (EN 1092-2 and ISO 7005-2)
tpe2 40 150 n a f a bqqe eyb 98416452 Pump start/stopSingle stage, close coupled, volute pump with in line suction and discharge ports of identical diameter. The pump is of the top pull out design, i. e. the power head (motor, pump head and impeller) can be removed for maintenance or service while the pump housing remains in the pipework. The shaft seal is according to EN 12756. Pipework connection is via PN 16 DIN flanges (EN 1092 2 and ISO 7005 2). The pump is fitted with a fan cooled, permanent
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy


















