Description
Durable Construction: Features a 2-piece forged brass body with a 300-series stainless steel ball for superior corrosion resistance
Does the 71M17 include the mounting hardware
Standardized Frame Specs: Designed for rapid installation in existing blower housings with minimal downtime
40" WC set point ensures the control board receives accurate airflow verification
Common Questions: How do I adjust the current trip point on the RIBXLCA
Velocity Boiler Works (Crown) 105591-01 LWCO 322027-701 Durable Construction: Features a 2-pieceWhen you are responding to a "no heat" call on a high efficiency condensing unit, a faulty Low Water Cut Off (LWCO) is often the silent culprit behind a hard lockout. The Velocity Boiler Works (Crown) 105591 01 LWCO is the direct OEM replacement engineered for the Phantom 80 180 and the full Raptor series. This 24 VAC safety device utilizes advanced PHNTM technology, integrating multi level sensing to provide precise water level monitoring without the
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
US$ 120.00
US$ 860.00
US$ 17.95
US$ 17.95
US$ 49.00





